15 Nov 2024
When building a layer truss, pay special attention to the connection points. Because the quality of installation and materials determines the final effect.
Step 1. Assemble base & pillar
Assemble the adjustable base and stage stand.
Step 2. Connect pillars & horizontal pipes for frame
Connect the Pillar using Horizontal pipe to form the truss frame.
Step 3. Secure the connection
Use Bolt locks to secure the connection in place.
Step 4. Install the diagonal pipes
Install 4-sided diagonal pipe for increased tensile stability.
In short, the most important thing in building a Layer truss is to install the truss frame, Because the quality of installation and materials determines the final effect.
Keywords: layer truss
Originally published 15 Nov 2024, updated 15 Nov 2024.
11
Founded 11 years ago
155
Exported to 155 countries
12600+
Served 12600+ customers
10000
Built a 10,000 ㎡ automated factory